Load restriction in effect – Poplar Crescent Bridge
Please be advised as a result of our Ontario Structure Inspection Manual (OSIM) bridge inspection completed by Tatham Engineering, it was determined that Bridge 201 (Poplar Crescent Bridge) exhibits structural deficiencies and that a gross weight restriction of 20 tones be imposed to ensure structural integrity until its repair or replacement in 2025.
As a result, effective immediately, the Township of Ramara has placed a weight restriction on Bride 201, situated on Poplar Crescent between Pinetree Court and Turtle Path, limiting the maximum weight to 20 tonnes. No vehicle or combination of vehicles, regardless of whether they are empty or loaded, may exceed a gross vehicle weight of 20 tonnes when crossing Bridge 201.
Contact Us